Etude géologique, géotechnique et dimensionnement de corps de chaussée de la pénétrante autoroutière de Batna (échangeur RN03/RN75) à Bir Echouhada sur le long de 10 km
Loading...
Date
Journal Title
Journal ISSN
Volume Title
Publisher
Université Ferhat Abbas Sétif 1. Institut d'Architecture et Sciences de la Terre. Département de Géologie
Abstract
The construction of new road infrastructure, the upgrading, upgrading, widening and duplication of roads are types of road works planned by the relevant departments, namely the Ministry of Public Works, public works directorates, technical services of committees, to enable the development of road networks The geological, geotechnical and dimensioning of the roadway body of the motorway penetrating connecting the East-West motorway to the interchange RN3/RN75 , section Batna along 10 km from PK 1+600 to PK 9+600 ,located between the RN 75 which leads to the Mostpha Ben Bou Laid Airport , and the road which leads to Mecheta Es Sahais.
Description
بناء بنية تحتية جديدة للطرق، تحسينها، تعزيزها وتوسيع نطاق ازدواجيتها هي من بين أنواع اعمال الطرق التي تخطط لها الادارات المعنية وهم: وزارة الاشغال العامة مديرية، الا شغال العامة والخدمات التقية للبلديات. قمنا بدراسة جيولوجية جيوتقنية للطريق السريع المتسلل، الذي يربط الطريق السريع شرق غرب بتبادل RN3/RN75, وهو القسم الذي يمتد على طول 10 كم من PK 1+600 الى PK 9+600 , ويقع بين RN75 الذي يؤدي الى مطار مصطفى بن بو لعيد و مشتى السايح.